MIL-DTL-5790H
Table IV. Requirement-verification cross reference matrix.
Requirement
Verification test
paragraph
Requirement
paragraph
3.6
Scale error tolerance
4.6.2
3.6
Friction error tolerance
4.6.3
3.6
Position error tolerance
4.6.4
3.6.1
Case leakage
4.6.5
3.6.8
Electrical characteristics
4.6.6
3.6.8.1
Open secondary
4.6.6.1
3.6.8.2
Power consumption
4.6.6.2
3.6.8.3
Secondary voltage
4.6.6.3
3.6.8.4
Power supply variation
4.6.6.4
3.6.8.5
Dielectric strength
4.6.6.5
3.6.8.6
Electrical zero
4.6.6.6
3.6.9.4
Low temperature (operational)
4.6.7
3.6.9.4
High temperature (operational)
4.6.8
3.6.9.5
Vibration
4.6.9
3.6.4
Indicator operation
4.6.10
3.6.7
Torque
4.6.11
3.6.9.4
Low temperature (non-operational)
4.6.12
3.6.9.4
High temperature (non-operational)
4.6.13
3.6.9.3
Pressure-altitude
4.6.14
3.6.2
Electromagnetic interference
4.6.15
3.6.3
Overpressure
4.6.16
3.2.1
Salt fog
4.6.1, 4.6.17
3.2.1
Fungus
4.6.1, 4.6.22
3.6.6
Damping
4.6.18
3.6.5
Seasoning
4.6.19
3.6.9.2
Shock
4.6.20
3.6.9.1
Humidity
4.6.21
3.6.10
Reliability
4.6.23
4.5 Conformance inspection. Conformance inspection shall be in accordance with
MIL-STD-1916 and shall consist of the individual tests (see 4.5.1) for each unit produced as well
as sampling plan A tests (see 4.5.2) or sampling plan B tests (see 4.5.3) if required by the
procuring activity (see 6.3).
9